Visualization of the finished building (interior and exterior)

Exterior

First floor

Second floor

Third floor

Fourth floor

Construction process

2020-05-01 Appliances, different works

2020-03-15 Interior works

2020-01-31 Framing works

2020-01-03 Framing works

2019-12-04 Finished foundation work

2019-10-16 Demolition of the previous building

2019-10-27 Finished concrete works

2019-10-23 Formwork

2019-10-18 Concrete works

2019-10-20 Representatives from the city of Seattle accepting the demolition job

2019-10-10 Approved plan set (62 MB to download)

2017-11-05 Schematic design by Caron Architect